Mostly good news about Tryon bridges, greenway, City Blvd

Oct 5, 2016 | Events, Greenways, Transportation

North Tryon bridgeOne done. One close. And one open. That’s the short take on two major road projects and a related greenway.

  • Done: Charlotte’s extension of University City Boulevard to its future link to realigned Mallard Creek Road.
  • Close: North Tryon Street bridges over Mallard Creek (though the southbound bridge is down to one lane for a month or more).
  • Open: Mallard Creek Greenway beneath North Tryon Street.

Charlotte finishes City Boulevard Extension

Construction is complete on the City Boulevard Extension Project and the road is now open to traffic, the city announced last week.  Improvements include a four-lane, median-divided roadway with curb and gutter, bicycle lanes, planting strips and sidewalks.

City Boulevard now extends University City Boulevard westward from its existing intersection at Neal Road to the future alignment of Mallard Creek Road near Rumple Road.  The NCDOT Mallard Creek Extension project remains under construction, which the City Boulevard project will connect to.

City Boulevard travel lanes will decrease from four lanes to two at Rumple Road.  This traffic pattern will be used until the NCDOT’s project is completed in 2017 and the tie-in can be made.

 

Tryon Street lane closings over Mallard Creek

A temporary closure of two out of three lanes on the southbound North Tryon Street bridge over Mallard Creek may last until mid-November, the state Transportation Department says. The lane closure is necessary to strengthen the roadbed. On a positive note, the two-year project to replace two outdated bridges will be finished about the same time.

Each new bridge will have three lanes, a bike lane and sidewalk once the project is finished. The old bridges were two lanes and lacked both sidewalks and bike lanes.

 

Mallard Creek GreenwayState ends Mallard Creek Greenway detour

Popular Mallard Creek Greenway reopened recently after about two years of detours around the state’s bridge replacement project on North Tryon Street.

Two sidewalks that run from the greenway to North Tryon Street will remain and connect in to new sidewalks along North Tryon Street and the new bridges.

0 Comments


Receive Up to Date News


Receive Economic Development News


View Past Newsletters


View Post by Category


Press Releases

Our retail story continues to be written

By Mary Hopper Executive Director On any given week, the University City Partners office fields more calls about retail than anything else. While that has been true during all of our 10-year existence, those inquiries have accelerated with Belgate’s opening. Perhaps...

Making sure that University City is Center Stage

If you ever heard the adage, “Out of sight is out of mind,” you will appreciate University City Partners’ need to stay connected. UCP staff members devote a lot of time and energy to attending meetings, doing presentations and telling the University City story while...

A healthier future grows here

A new garden at CMC-University will soon yield berries, peppers, squash AND healthier humans, hopes garden founder Elaine Jones. A dietitian who counsels hospital patients, Jones sees the garden as a wellness classroom where adults and kids can learn about the...

Take that, crooks!

Campus crime dropped 30 percent between 2010 and 2011, says a new report from UNC Charlotte’s police. University City police also had a great year, with crime down 13.9 percent – the second best record of CMPD’s 13 divisions. One drop in particular indicates...